PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work at the Sally Ports Facing West.jpg Curtain wall Mullions delivery.jpg Exterior framing at the 2nd floor Facing West.jpg Exterior metal framing at the 2nd floor Facing West.jpg Installed sprinkler head at the 2nd floor Facing North.jpg Installing copper piping at the 4th floor Facing North.jpg Installing electrical split wire above the ceiling at the 2nd floor Facing West.jpg Installing Sprinkler main raiser at the 4th floor Facing North-East.jpg Interior metal framing at the 4th floor Facing West.jpg
Previous pageNext page Installed sprinkler head at the 2nd floor Facing North
Installed sprinkler head at the 2nd floor Facing North